Infrastructure Application

" The Rollie Rack's Way"

We Break The Norms To Build Government Infrastructures And Steel Towers

OUR SOLUTION

For

Infrastructures

Bridges And Overpass

Skyway And Viaducts

Elevated Railways

Underground Tunnels

Seaports And Quay Walls

JUST GET IT DONE

Click To Explore 

View Public Videos

For Infrastructures

And Towers

Click To Explore 

Infrastructures

DIVISION

To Solve Notorious Traffic

Click To Explore 

  Inquire HERE 

Join Rollie Rack's Global Alliance

To build A Better World


The Time Has Come

To Revolutionize The Infrastructure Industry Via   

A Game-Changing Building Technology "The Rollie Rack's Way"

We left behind  the age-old problematic system we've been doing for decades associated with the never ending technical issues, sad stories, and struggles at the design office, fabrication shop, and at the construction site. This has to stop, "The Rollie Rack's Way" has come with a new system and methods to simplify the complicated as we radically change the way to design, fabricate, erect, and construct infrastructure projects to make them faster in delivery, maintains the quality of work, stonger structures, and economical than the conventional systems. 

Let's Get Started

  Via "The Rollie Rack's Way" 

Bridges And Overpass Projects

This Overpass Bridge Looks The Same

But Designed And Built Differently

Design Philosophy

The Design Philosophy, is somewhat like a newly improved old track, has been proven a superior element for decades by many R&D research teams worldwide, their conclusive results suggest an overwhelming benefits to the system which has shown a superior performance of its strength in both axial and flexural capacities based on the series of tests conducted by different research teams. This system is packed with amazing benefits such as:  faster to execute the design, fabrication, erection, and ends up economical, but has not been used popularly by the industry due to being an "Incomplete System". R&D teams had tried fixing some missing elements but unsuccessful, few companies had used them to avail the benefits in their projects but the system remain unsolved.

The Right Fix

The inventor got it right and was successful in fixing the missing elements to make the "System Complete and Working". The technical aspects and workability of Rollie Rack System went through a very long process of substantive review by international patent examiners from the World Intellectual Property Organization (WIPO), U.N. Head Quarter, Geneva, Switzerland, who are world's top technical experts with technical integrity who value technical standards at highest level on their reviews. His invention to complete the system has passed without going through a technical argument on the working theories employed, this creation of a new building system was perfect which makes the workability aspect flatly understandable and self explanatory. Due to novelty, uniqueness, simplicity, and inventiveness of the revolutionary idea, patents have been granted at international level to protect the invention and also represents as undisputable validation to the technical compliance of the building system.

The Good News

This revolutionary system has entered the commercialization phase to help the construction industry to advance forward in dealing with a variety of projects driven by the new system with less problem and less stress to make everyone happy. This product is a norm-breaker which bears a registered Trademark "The Rollie Rack's Way". 

Skyway And Viaducts Projects

Each Position Of Column And Cap Beam

Can Be Completed Within 1 WeeK, Right After the Pedestal is Done.

Cast In Situ Concrete, But Much Faster than Any Conventional Method

Can Out-Perform Conventional Methods By Far In Terms Of

Cost, Schedule, Stability, Strength, Simplicity, Flexibility, Constructability, And Safety.

The Quality of our 3D Video Presentation paints a thousand words, obviously, it speak towards who we are,

it demonstrates our wealth of experience, matured skills, expertise, capabilities, and our innovative thinking in dealing with conceptual and hardcore designs, engineering, consultancy, management, fabrication, and construction executions in a variety of Infrastructure Projects.

ATTENTION

Government Agencies :  Department Of Public Works And Highways (DPWH), Infrastructure Divisions, Department Of 

General Inquiry

Transportation, and Department Of Telecomunications in every Country, kindly, find a way to explore this new system the soonest and let's get started by employing this new system to your Infrastructure projects to enjoy the amazing and big time benefits. 

Elevated Railway Projects

Each Position Of Column And Cap Beam

Can Be Completed Within 1 WeeK, Right After the Pedestal is Done.

Cast In Situ Concrete, But Much Faster than Any Conventional Method

Problems Associated With The Traditional-Conventional Methods

Everyone would agree, we are tired in dealing with the Traditional-conventional system in building infrastructure project due to the slow progress of work, and in so many cases, it caused consistent delay in project deliveries.


Let's take an example from a live event, when a new construction of a skyway project located in a busy city street is delayed and missed-out the contractual deadline of turn-over, it would mean many bad things, it extends the non-usability of the new skyway, members of the site team got regular annoying cursed from angry riding public due to extended road traffic sufferings, Government officials find it difficult in explaining to angry riding public. On the commercial aspects, big loss in tollway sales, disappoint investors, can damage operator's reputation, extra claims versus penalties between Operator and General Contractor, affecting all subcontractors, suppliers, and vendors down the line, and often times ends up in legal disputes. The delay-pattern and cursed is established in the infrastructure sectors globally. 

Each Long Span Girder Is A Post-Tensioned

 Delivered in two parts to ease the transportation of Girders.

Delivery is 24/7  cannot be done by Conventional Method.

Public's Satisfaction Is Difficult To Achieve

In A Traditional-Conventional Methods When Building Infrastructures Projects.

So What's The Deal?

Just Get It Done " The Rollie Rack's Way"

Rollie Rack's System can build the fastest but economical Infrastructure Projects over conventional systems.  What trully matters, is the fast delivery which can shorten the sufferings of riding public by traffic congestions. 

This Overpass Bridge Looks The Same

But Designed And Built Differently

We Provide Better Solutions

It has made an extremely complicated

execution of work into a much : 

1.   Easier 
2.   Simpler 
3.   Stronger 
4.   Cheaper 
5.   Earlier 
6.   Faster 
7.   Happier 
8.   Prettier 
9.   Cooler And
10. Safer To Execute.

List Of Structures

Which can enjoy the amazing and big

time benefits over the conventional system

1.   Elevated Railways, RRTs 
2.   Highway Interchange 
3.   Skyways
4.   Viaducts
5.   Bridges
6.   Overpass 
7.   Pedestrian Bridge
8.   Rail Bridge

9.   Tunnel/Subway Supports

10.  Airports And Seaports

11.  All Types Of Steel Towers 

This Overpass Bridge Looks The Same

But Designed And Built Differently

The "WOW FACTORS" 

Of Rollie Rack That Can Never Be Matched

1.   Overall Cost - BETTER,

      Much Cheaper, saving huge amount of time in delivering an infrastructure project is saving a lot of money from daily

      operational expenses particularly heavy equipment rental cost.
2.   Strength and Stability – BETTER,

      Robust structural system, highly resistant to lateral forces, no concrete breakout during seismic attack on structures.          3.   Schedule – BETTER,

      Over-all Time Savings is super huge by a normal work operation, expected to be 40% is expected. Early project delivery

      Rollie Rack's System can build the fastest infrastructure, e.g. skyway, bridge, overpass, LRT in the world.

4.   Engineering Execution – BETTER,

      Complex and exhaustive engineering execution is simplified and faster in delivery of drawings, providing design flexibility, 

      compliant to International Design Codes.
5.   Fabrication Work - BETTER,

      Compliant to patented methods in a systematic and perfect sequential order to match accordingly with construction

      and erection sequence, fabrication can start straight away after 30% design review. Find out how and why? 
6.   Materials Delivery – BETTER,

      Are planned in a systematic and perfect sequential order to suit with Rollie Rack System.
7.   Construction and Erection – BETTER,

      Compliant to patented methods in a systematic and in perfect sequential order in accordance with Rollie Rack System.

8.   Stress free Workplace - BETTER

      Result: The stressful workplace we all endured and experienced in dealing with Traditional-Conventional Execution is 

      converted into a stress-free workplace environment via the "Rollie Racks Way."

This River Bridge Looks The Same

But Designed And Built Differently

WE ARE OPEN 

For Technology Partnership To Infrastructure Projects 
We have a separate 3D Video Technical Presentations For Elevated Railways, Skyways, Bridges (not posted)

it has demonstrated every step on how the system works perfectly understandable even by Non-engineers.

To Government Heads, EPC Contractors, Design Consultants, and Fabricators "Together We Will Deliver" via

" The Rollie Rack's Way "


Request For Online

Rollie Rack's Technical Presentation

For Government Infrastructures

View Videos

For Infrastructures

And Towers

Inquire For Partnership

Rollie Rack's Global Alliance

The Above Features Are Good News To Infrastructure Sectors

All Government Infrastructure Projects anywhere in the world can be done and delivered earlier via "The Rollie Rack Way".

Think about this, while the cost is reduced, it produces a stronger structural system, much faster in delivery, and safer in execution. From today onwards, erecting infrastructures will never be the same again.

Be Cautioned : 

To all skeptics, don't think of any complicated things here, Rollie Rack was invented to make complicated things simple.

Don't believe, and don't argue until you view the 3D video Technical Presentation. 

No more Delays, No more Arguments, No more Disputes, and No more Nightmares. Means everyone is happy.

Click To Explore 

Click Public Videos

Click To Explore 

Click Public Videos

Click To Explore 

Click Public Videos