I n t e r n a t i o n a l
" We Are Changing The Way To Build A Better World"
Click To Explore
Inventor Rollie Rack
We left behind the age-old problematic system we've been doing for decades associated with the never ending technical issues, sad stories, and struggles at the design office, fabrication shop, and at the construction site. This has to stop, "The Rollie Rack's Way" has come with a new system and methods to simplify the complicated as we radically change the way to design, fabricate, erect, construct, and revamp refinery structures and other similar structures with No bracing element but stable and stronger structure. No-bracing, means No-clashing with the pipes.
But Designed And Built Differently - NO Bracing But Stable, Stronger, And Economical
Design Philosophy
The Design Philosophy, is somewhat like a newly improved old track, has been proven a superior element for decades by many R&D research teams worldwide, their conclusive results suggest an overwhelming benefits to the system which has shown a superior performance of its strength in both axial and flexural capacities based on the series of tests conducted by different research teams. This system is packed with amazing benefits such as: faster to execute the design, fabrication, erection, and ends up economical, but has not been used popularly by the industry due to being an "Incomplete System". R&D teams had tried fixing some missing elements but unsuccessful, few companies had used them to avail the benefits in their projects but the system remain unsolved.
The Right Fix
The inventor got it right and was successful in fixing the missing elements to make the "System Complete and Working". The technical aspects and workability of Rollie Rack System went through a very long process of substantive review by international patent examiners from the World Intellectual Property Organization (WIPO), U.N. Head Quarter, Geneva, Switzerland, who are world's top technical experts with technical integrity who value technical standards at highest level on their reviews. His invention to complete the system has passed without going through a technical argument on the working theories employed, this creation of a new building system was perfect which makes the workability aspect flatly understandable and self explanatory. Due to novelty, uniqueness, simplicity, and inventiveness of the revolutionary idea, patents have been granted at international level to protect the invention and also represents as undisputable validation to the technical compliance of the building system.
The Good News
ATTENTION
But Designed And Built Differently - NO Bracing But Stable, Stronger, And Economical
CAN OUT-PERFORM ANY CONVENTIONAL METHOD BY FAR
Everyone would agree, we're all tired enough in dealing with recycled and repeated problems when building new refineries and during their periodic revampings. What is not acceptable, these problems are exactly the same, time and time again from project to projects across the globe for centuries. We know the main culprit, is the traditional conventional system with primitive capabilities we've been employing in every refinery project across the globe. These methods are either: Stick-built, Modular, and Precast Concrete, and in so many cases, these aged-old methods are the main cause of delay in every project delivery. Find out below why?.
1. Overall Costing Problem
Every new built Refinery' Always ends-up in over budget, Cost overrun, leading to EPC extra claims, often times lands in legal disputes.
2. Engineering Integrity Problem
Anomalies in strength and stability of structures leading to overloading, has limited design margin due to EPC's cost control to win a bid.
3. Schedule Problem
Unpredictable project delivery, missing out Contract schedule. Conventional structures in refineries are main contributor of project delays.
4. Engineering Execution Problem
Hardcore engineering calculation of structures are complex and exhaustive, has no room for flexibility, affecting the deadlines of issuance.
5. Fabrication Problem
Slow moving design execution delays the bulk of fabrication activities, changes in design adds to the pain, because there is no flexibility.
6. Materials Delivery Problem
Huge volume of Deliveries of Fabricated items in multiple shapes and sizes complicates laydown and installation.
7. Erection And Construction Problem
The complex execution in the erection of structures by traditional-conventional methods has so much difficulties in meeting a deadline,
then, if we add the compounded delays in engineering, fabrication, delivery of fabricated items, design changes, and the never-ending
pipe changes at the project site can establish a big time delay in the over all erection phase. This delay-pattern is an industry trademark.
8. Never-ending Piping Changes Problem
Every design engineer and site enginer in the industry can attest this never-ending pipe changes problem has no possible solution, which
dates back from the very first refinery until today. Changes in piping drags down the structure's team into a never-ending rework at the
design office, fabrication yard, and at project site. This is a big contributor to extra claims and project delay.
9. Plant Revamping or Upgrading Problem
This is the most risky package in any contract award. The employment of traditional-conventional method in executing a revamping work
at shutdown condition of an existing plant is a nightmare to all people doing the job. You cannot avoid hotwork or welding work to add
new beams and columns to the existing structures. In every spark by welding can trigger an explosion, the industry is helpless on this.
10. Stressful Workplace
Summing up all the problems from nos.1 to 9 is a testament of a stressful workplace to everyone in a traditional-conventional execution.
But Designed And Built Differently- NO Bracing But Stable, Stronger, And Economical
Client's Satisfaction Is Difficult To Achieve In A Traditional-Conventional Methods
When Building Refineries and Processing Plant Projects.
So What's The Deal?
Just Get It Done " The Rollie Rack's Way"
Rollie Rack's Systems can build the fastest refinery structures in the world, much prettier in looks than any existing structure built by the old system. New refineries build with "The Rollie Rack's Way" are branded.
We Provide Better Solutions
It has made an extremely complicated
execution of work into a much :
1. Easier
2. Simpler
3. Stronger
4. Cheaper
5. Earlier
6. Faster
7. Happier
8. Prettier
9. Cooler And
10. Safer To Execute.
and completely with
the same functions.
List Of Structures
Which can enjoy the amazing and big
time benefits over the conventional system
1. Pipe Racks
2. Process Racks
3. Equipment Platforms
4. Equipment Supports
5. Equipment Shelters
6. Flare Tower Supports
7. Transfer Towers
8. All Buildings
9. Substations
10. Mis. Local Supports
12. Pipe Sleepers
But Designed And Built Differently- NO Bracing But Stable, Stronger, And Economical
WE ARE OPEN
For Technology Partnership To Oil & Gas Companies.
We have a separate 3D Video Technical Presentations (not publicly published)
it has demonstrated every step on how the system works perfectly understandable even by Non-engineers.
To Oil & Gas Companies And Operators "Together We Will Deliver " via
" The Rollie Rack's Way "
The "WOW FACTORS"
Of Rollie Rack (A Stick-Built) That Can Never Be Matched
1. Overall Cost - BETTER,
Much Cheaper, the expected savings is 10 to 20% versus the current Stick-built system, and estimated to be much
cheaper than Modular rack by 30 to 40% and faster in delivery. The cheapest of all.
Remark : You don't need a calculator to determine the huge cost savings once you viewed the 3D Models of the structures.
2. Strength and Stability – BETTER,
Robust with 50% margin, stable, highly resistant to sway, much stronger structural system, stronger base support connection
while using smaller anchor bolts and thinner base plates. So, while the cost is massively reduced, it gets stronger.
Remark : Every Structural Engineer can attest that the structure is robust, once you viewed the 3D Models, even less STAAD Cals.
3. Schedule – BETTER,
Estimated over-all time savings range from 20 to 30% when savings in engineering, fabrication, & erection are sum-up. Early delivery
is influenced by faster execution in engineering, fewer items to be fabricated, and simpler erection execution with flexibility.
Remark : Every project planner would agree that old productivity rates needs to be revised completely for an earlier timeline.
4. Engineering Execution – BETTER,
Complex and exhaustive engineering execution is simplified and faster in delivery of drawings, provides design flexibility, compliant to
piping requirements and international Design Codes. Pipes movement during design phase not an issue, it can be handled at the site.
Remark : Every member of the engineering team will be confident to deliver their deliverables before due date for the first time ever.
5. Fabrication Work - BETTER,
Complex and slow movement in engineering execution can delay fabrication activities, never-ending pipe changes add to the pain.
By employing our Rollie Rack Systems, fabrication can start straight away after 30% Model review. Find out how and why?
Remark : Every member of the fabrication team will be confident to deliver their fabricated items before due date for the first time ever.
6. Materials Delivery – BETTER,
Far fewer items with less total weight and variation in size and type, does not require large lay down areas.
Remark : Every member of the delivery team can attest a much fewer items and tonnages on their list to the same type of project.
7. Construction and Erection – BETTER,
Far fewer items to be erected, erection is simpler, easier, and faster. Tolerance is not limited, less Manpower, and less crane utilization
requirements. It does not even require highly skilled erectors to do the job.
Remark : Every construction guy can attest how easy life is, to erect structures via "Rollie Rack's Way" over the conventional systems.
8. Pipe Changes And Pipe Clashing Issues at Design and at Erection Stage – BETTER,
It allows unlimited changes in piping, pipes can be moved or relocated anytime and anywhere with No limit, because the supporting
I-beam can follow any changes in piping at exact location with no limit and no field welding. It can be done in minutes of exercise.
We have a patented signature in the connection system known as The "Peace Maker," dedicated to Piping and Structures Team.
Remark : The industry has been helpless on pipe changes and clashing problems for centuries. The common battle grounds between
piping team and structures team are during detailed engineering phase, 3D Model reviews, and at sites. At last, "peace has come."
9. Revamping And Upgrading Benefits - BEST OF ALL,
9.a Work is simplified, easier, quicker, and safer. Absolutely No hot work is required when adding new steel members to the existing.
9.b Allows new steel I-beams to be installed anytime and anywhere in minutes, can be moved repeatedly anytime with no hot work.
9.c If pipe ways are over-crowded inside, allows new Cantilever I-beams to be installed to any existing steel column with no welding.
9.d Also allows upward extension of new Columns anytime and anywhere to existing Steel Columns with no field welding.
9.e Allows new stairs, cage ladders, and miscellaneous boxes to be installed to existing steel columns anywhere, no welding.
9.f Highest level of Safety, by eliminating hot work in Revamping execution is a safe workplace in any form of a possible explosion.
Remark : The riskiest execution of work is revamping of an existing refinery plant at shut down condition, because as long as there
are hot works involved in revamping by conventional methods, explosion is on the frontline of Risks. The "Rollie Rack's Way" has no
hot work, or field welding in all executions. It removes explosion on the front list. The revamping works becomes safer to all workers.
10. Stress Free Workplace – BETTER,
Result: The stressful workplace we all endured and experienced in dealing with Traditional-Conventional Execution is converted to a
stress-free workplace environment via the "Rollie Racks Way".
But Designed And Built Differently- NO Bracing But Stable, Stronger, And Economical
IMPORTANT NOTE : The Amazing Revamping Features and Benefits perfectly works on Rollie Rack System only, which means, new refineries built entirely with Rollie Rack Structural Systems are the lucky ones to enjoy the revamping benefits. All existing refineries built with the old Problematic Conventional Systems will NOT enjoy the revamping benefits due to its being a Primitive System. That's the dividing line.
NOW IT'S TIME
TO MAKE A MOVE
If you have a new refinery project on your drawing boards, either on a Pre-FEED, FEED, and on early phase of EPC. Just get it done "The Rollie Rack's Way" to enjoy the full benefits from early engineering phase and throughout all periodic revamping stages.
But Designed And Built Differently- NO Bracing But Stable, Stronger, And Economical
THE CONVERSION PROCESS IS A STRAIGHT FORWARD
From Conventional Method To "Rollie Rack's Way" During Engineering Phase
1. Compliant to FEED layout, and the Geometries of all structures are completely and perfectly followed.
2. All design loads are completely applied to the structures, compliance to Design Specifications and International Codes.
3. Rollie Rack patented Design Philosophy, and Drawing Standards shall be employed compliant to International Codes.
4. All Materials are commercially available in every supplier and manufacturer's stock files. Definitely, No Material Science involved.
5. Engineering executions like Production of Drawings and Engineering Calculations is simplified and get super faster by 30% savings.
6. After 30% Model Review when the project plot got frozen, Drawings can be issued to commence fabrication at the earliest.
7. Trouble Makers: pipe changes and movements can be handled at the site even if done repeatedly, No impact to cost and schedule.
8. Trouble Makers: pipe clashing issues with the structural members particularly on bracing elements are all gone. We have No bracing.
9. Trouble Makers: thick base plates and large anchor bolts are replaced with smaller ones but robust and stable, compliant to integrity.
10. Trouble Makers: lateral sways got minimized, Rollie Rack's System got sufficient margins on stability of structures and strength.
11. All Major Trouble Makers were gone. Think about this, while the Cost and Steel Tonnage are massively reduced, it ends up stronger.
12. Summing up the WOW Factors, Revamping Benefits, and the Conversion Benefits. It's totally a Home Run. Can never be matched.
Has Single Line Of Post, Designed And Built Differently- NO Bracing But Stable, Stronger, And Economical
All Are Good News, Amazing, A "HOME RUN" Of Solutions
We have a challenge, before you can ever think of a particular pipe rack issue that had caused you problems previously
in so many cases in different projects and locations, it has been solved already by the new Rollie Rack System. Just Try it.
Refineries and similar industrial plant projects anywhere in the world can be done and delivered earlier via "The Rollie Rack Way."
Think about this, while the cost is hugely reduced, it produces a stronger structural system, much faster in delivery, and safer in execution. From today onwards, erecting structures will never be the same again.
Be Cautioned :
To all skeptics, don't think of any complicated things here, Rollie Rack was invented to make complicated things simple.
Don't believe, and don't argue until you view the 3D video Technical Presentation.
No more Delays, No more Arguments, No more Disputes, and No more Nightmares. It means, everyone is happy.
KINDLY REPORT PIRACY IN ALL STAGES, EITHER ATTEMPTING, COMMITTING, AND DONE
Get rewarded by a Good Cause.
Report to us : piracy@rollieracks.com